Browsing AU-IBAR Initiatives and Project Reports by Title
Now showing items 288-307 of 336
-
SADC Regional Livestock Sector Training Workshop on Internal Quality Control and External Quality Assurance Programmes for Veterinary Laboratories
The workshop was one of the activities of the IAEA funded SADC regional project, RAF/5/053, on Control and Eradication of major Epizootics which will run between 2001 and 2003. The overall objective of this project is to ... -
SERVICE CONTRACT financed under the 8th European Development Fund - Project Nr 8-ACP-TPS 32
(2007-01)The Regional Technical Assistant, Dr. Nicolas Denormandie, was based at the Regional Coordination Unit of PACE in Bamako (Mali). He was covering initially seven French-speaking countries within Western and Central Africa, ... -
SERVICE CONTRACT financed under the 8th European Development Fund - Project Nr 8-ACP-TPS 32
Following the signature of the of its headquarters agreement (Maputo, 28thJuly 2003) between the AU and Ethiopian Government, PANVAC was re-opened in February 2004 with the arrival at duty station of the Chief Technical ... -
Service Contract financed under the 8th European Development Fund - Project Nr 8ACPTPS 32.
The report covers the period July to December 2003. During this period, two changes were made in the assignment of TAs to country/region of assignment, notably in Tanzania and Cameroon. In Tanzania, Dr Philippe Leppere ... -
SEVETEENTH (17m) MINISTERIAL COORDINATION MEETING
The 171" Farming in Tsetse Controlled Areas (FITCA) Ministerial Coordination Meeting was held at Hotel Triangle Annexe in Jinja, Uganda between the 23rd-251" of March, 2003. It was attended by over 100 participants who ... -
Sheikh Technical Veterinary School Curriculum Development (Nairobi and Bologna Workshops).
The development of a curriculum for the Sheikh Technical Veterinary School (STVS) is one of the most important activities of the first phase of the project. There are different approaches to identify and develop a school ... -
Somali Ecosystem (SES)
Since the introduction of Rinderpest to the African continent in the 1890s there have been several efforts to remove this disease. These efforts had by 1905 succeeded in southern Africa. But for several reasons efforts to ... -
SOMALI ECOSYSTEM RINDERPEST ERADICATION COORDINATION UNIT (SERECU)
This final report of Somali Ecosystem Rinderpest Eradication Coordination Unit (SERECU) provides an overview of project justification and objectives, achievements, constraints, lessons learnt and suggested recommendations. ... -
SOMALI PACE PROJECT - Contract No. PACE-EDF-TN-001-01
The Somali PACE Component operates under the overall PACE objective aiming at improving farmers' incomes and peoples' general living conditions by strengthening livestock services and hence improve and maintain animal ... -
Somali PACE Project Second quartely report.
The Somali PACE Component operates under the overall PACE objective aiming at improving farmers' incomes and peoples' general living conditions by strengthening livestock services and hence improve and maintain animal ... -
Strategie Panafricaine Sur l’amelioration de la Collecte, de l’analyse et de la Diffusion des Donnees Sur la Peche et l’aquaculture
(2014-05)Strategie Panafricaine Sur l’amelioration de la Collecte, de l’analyse et de la Diffusion des Donnees Sur la Peche et l’aquaculture -
Strategy for Institutional Coordination Between RECs and RFBs and Strengthening Their Relationships with NSAs
(2023)This Policy Brief is the consolidation of the outcomes of the deliberations of the AFRM Working Groups and the Think Tank Executive Committee inaugural meetings and workshops organized by African Union-Inter-African Bureau ... -
STRATEGY OF THE PACE PROGRAMME
Livestock constitute an important part of the economy in Africa. Apart from 160 million cattle, there are large populations of small ruminants, pigs and poultry, in addition to camels and equines, the importance of which ... -
Subdelegation Manual: Version 2.0
(2021-08)This manual will provide a step by step guidance on the processes and procedures that sub-delegatees and AU-IBAR should apply in the course of implementing activities sub-delegated by AU-IBAR. -
Submission of Year III Work Planand Cost Estimate
The Pan African Programme for the Control of Epizootics (PACE) Project is currently implemented in 32 African countries with a budget allocated from member countries and a grant from the European Union. The PACE programme will ... -
Support short term mission for the establishment of the PACE Web-site
On request of IBAR/PACE, these short teen missions aims to support PACE co-ordination in designing and preparing a web-site to put online. The missions are provided under the ongoing TA contract between AU-1BAR and ... -
SUSTAINABLE AGRICULTURE PROGRAMME INTERNATIONAL INSTITUTE FOR ENVIRONMENT AND DEVELOPMENT.pdf
Established in 1971, the International Institute for Environment and Development (TIED) is a policy research institute linking environmental concerns with the developments needs of resource-poor people in the South and ... -
Synthesis of PACE Financial Report
The team of consultants should mention that after meeting with the main financial controller of the PACE programme, Mr. Alex Saelert, they have been signified that the financial data obtained are not final since the programme ...