Browsing Pan-African Programme for the Control of Epizootics (PACE) [1999-2007] by Title
Now showing items 1-20 of 183
-
10th PACE Narrative quarterly report 01/03/03 - 30/04/04.
The operations of the Somali PACE Component are governed by the overall PACE objective aimed at relieving the poverty of those involved in the livestock-farming sector (producers, service providers and consumers) in Africa ... -
2nd Year workplan and cost estimates for Pan-African control of epizootics..PDF
The Pan African Programme for the Control of Epizootics (PACE) is a major player in the eradication of rinderpest from the last endemic areas located in East Africa. The four-year PACE programme is being implemented in ... -
3rd Year workplan and cost estimates for Pan-African Control of Epizootics (PACE) Uganda national PACE programme.
The Pan African Programme for the Control of Epizootics (PACE) is a major player in the eradication of rinderpest from the last endemic areas located in East Africa. The four-year PACE programme is currently being implemented ... -
7TH ADVISORY COMMITTEE MEETING OF THE PACE PROGRAMME 2 5 APRIL 2003 NAIROBI KENYA
7TH ADVISORY COMMITTEE MEETING OF THE PACE PROGRAMME 2 5 APRIL 2003 NAIROBI KENYA -
7TH ADVISORY COMMITTEE MEETING OF THE PACE PROGRAMME 2-5 APRIL 2003 NAIROBI, KENYA
7TH ADVISORY COMMITTEE MEETING OF THE PACE PROGRAMME 2-5 APRIL 2003 NAIROBI, KENYA -
7th advisory committee meeting of the PACE programme 2-5 April 2003 Nairobi, Kenya.
7th advisory committee meeting of the PACE programme 2-5 April 2003 Nairobi, Kenya. -
9th Advisory Committee Meeting of the PACE Programme
The AC notes with concern that the recommendation of the 7th ACM for a consultant to be appointed to review the recommendations of the Mid-Term Review (MTR) has not been followed. These delays might result in an irrational ... -
9th Advisory Committee Meeting of the PACE Programme
The PACE mid-term review as well as the 6th , 7th and 8th Advisory Committee meetings recommended specific directions the communication unit was to follow. For example , the mid-term review recommended clearly a more ... -
9th Advisory Committee Meeting of the PACE Programme - 2
CBPP is a disease of economic importance because of the high morbidity and mortality losses it causes to cattle. The financial implications of these losses are of great significance to both cattle owners and to the nation. ... -
9th Advisory Committee Meeting of the PACE Programme - 3
The PACE mid-term review as well as the 6th 7'11 and 8'11 Advisory Committee meetings recommended specific directions the communication unit was to follow. For example , the mid-term review recommended clearly a more ... -
AN ASSESSMENT OF VETERINARY SERVICE DELIVERY SYSTEMS IN THE SOMALI ECO-SYSTEM
Rinderpest eradication is a global objective and the African Union / Inter African Bureau for Animal Resources (AU / IBAR), through the Pan African Programme for the Control of Epizootics (PACE), is spearheading the ... -
An Assessment of Veterinary Service Delivery Systems in the Somali Eco-System
Rinderpest eradication is a global objective and the African Union / Inter African Bureau for Animal Resources (AU / IBAR), through the Pan African Programme for the Control of Epizootics (PACE), is spearheading the ... -
Annual Operational Review 2003 ESA Region EC Co-operation
The Cotonou Agreement attaches particular emphasis to regional economic integration and the role of regional organisations (see Art.28-30 and Annex IV, Art. 6-14). Regional organisations with an economic integration mandate ... -
ANNUAL WORK PLAN _ COST ESTIMATE FOR PACE (GAMBIA)
The European Commission has supported the continent-wide fight against rinderpest, through the Pan African Rinderpest Campaign (PARC). This project has had considerable success and The Gambia has been declared provisionally ... -
Annual work programme _ cost estimate for PACE Tanzania Year 2 (1st November 2002 to 31st October 2003).
This is a second Annual Work Plan and Cost Estimate for the PACE (Tanzania) Component which is part of the Regional Pan-African Programme for the Control of Epizootics (PACE) under the African Union Inter-African Bureau ... -
Annual work programme _ cost estimate for PACE Tanzania(1st November 2002 to 31st October 2003).
This is a second Annual Work Plan and Cost Estimate for the PACE (Tanzania) Component which is part of the Regional Pan-African Programme for the Control of Epizootics (PACE) under the Organization of African Unity ... -
Aquaculture Aux Seychelles: Histoire, État Actuel du Jeu et Lecons Apprises.
Le déclin des pêcheries de capture traditionnellement fiables et l’augmentation de la demande en matière de poissons aux Seychelles représente une préoccupation d’envergure en termes d’économie et de sécurité alimentaire. ... -
AU-IBAR ANIMAL RESOURCE DEVELOPMENT STRATEGY
The African Union Inter-African Bureau for Animal Resources (AU-IBAR) is one of the specialised technical offices of the African Union (AU) under the Department of Rural Economy and Agriculture (DREA). The new mandate ...