Show simple item record

Annual work programme _ cost estimate for PACE Tanzania Year 2 (1st November 2002 to 31st October 2003).

dc.contributor.authorAfrican Union Inter-African Bureau for Animal Resources
dc.contributor.authorAU-IBAR
dc.date.accessioned2021-02-23T19:18:14Z
dc.date.available2021-02-23T19:18:14Z
dc.identifier.urihttp://197.254.26.150/handle/123456789/354
dc.description.abstractThis is a second Annual Work Plan and Cost Estimate for the PACE (Tanzania) Component which is part of the Regional Pan-African Programme for the Control of Epizootics (PACE) under the African Union Inter-African Bureau of Animal Resources (AU-IBAR). The first Annual Work Plan and Cost Estimate was approved and funded Tsh.1, 004,080,000 equivalent to Euro 1,056,926 running from 1stNovember 2001 to 31stOctober 2002. The Tanzanian Component got on board late and thus there was a lost time of two years that need to be taken in consideration in the mid term review for a possible extension after October 2004. The Government of Tanzania (GOT) has met the requirement that National Budgets to Epidemio-surveillance activities should show an increasing trend in budget allocation to Animal Health Services and that countries should be committed towards compliance to the OIE Pathway in the eradication of Rinderpest. In the fiscal year 2001/2002 besides Personnel Emoluments indicated in Year 1 Work Plan of Tsh.182, 000,000 the government released Tsh 847,700,000 to PACE (TZ) related activities, which were for CBPP control (Tsh.434, 000,000) and Other Veterinary Services (Tsh 413,700,000). In year 2002/2003 the government budget to Epidemio-surveillance and control of epizootic diseases of high economic significance is envisaged to increase following the adopted Activity & Target based Budgeting System and the inclusion of Animal Diseases Control Programme as one of the Intervesion logic in the Agriculture Sector Development Programme (ASDP) The first year of PACE (TZ) was mostly a capacity building and inception phase of the programme. Implementation of the planned activities and funds utilization up to July 31st2002 reached good levels. A developed Performance Management System (PMS) spearheaded project performance in year 1 Work Plan.
dc.subjectPan-African Control of Epizootics (PACE)
dc.titleAnnual work programme _ cost estimate for PACE Tanzania Year 2 (1st November 2002 to 31st October 2003).
dc.typeReport


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record